![]() ![]() ![]() JURNAL TEKNOLOGI DAN OPEN SOURCE ISSN ONLINE : 2622-1659 VOL. Cost control is done as a result of the existence of an unfavorable difference between the budget and the realization of project costs. Pada mata kuliah ini mahasiswa akan dibentuk dalam satukelompok dengan. 7,640,000.00 for the labour, and a profitable difference of Rp. 51,590,876.00 for materials, favourable difference around Rp. Project of Procurement and Installation Pipeline of Distribution Service at Rapak Lambur village, founded a favourable difference Rp. Pemanfaatan Teknologi Informasi dalam Simulasi Perhitungan Harga Pokok Penjualan dan Keuntungan Usaha bagi Tenan. ![]() This study used analysis of variant, which is if the budget project cost more than its realization then there will be a beneficiary difference, meanwhile if the budget project cost less than its realization then there will be a disadvantageous difference. The research data of this study was obtained directly from secondary data in form of the budget plan and its realization which is obtained directly from the company and also direct interview with company side. Qadafi Khairuzzaman 2 Program Studi Manajemen Informatika AMIK BSI Pontianak Jl. The purpose of this study is to analyse the budget plan and the cost realization in Procurement and Installation of Pipeline Distribution Service Project at Rapak Lambur Village. 2 DESEMBER 2017 p-ISSN: 2339-1928 & e-ISSN: 2579-633X 103 PERANCANGAN SISTEM INFORMASI MANAJEMEN PROYEK : SISTEM INFORMASI KONTRAKTOR Heru Setiawan 1, M. ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |